TECHNICAL PROJECT
Engineering & Integration Parameters
- Integration Area: 580 sq ft
- Load Requirements: 85kg/linear meter
- Manufacturing Timeline: 7 weeks
- Installation Period: 2.5 weeks
MANUFACTURING SPECIFICATIONS
Component Production:
- CNC Fabrication Protocol: Handle-less system
- Material Core: E1 Grade MDF, 18mm/25mm
- Edge Treatment: PUR zero-joint technology
- Hardware Integration: Servo-drive systems
TECHNICAL INTEGRATION Installation Protocol:
- Sequential Module Assembly
- Load Distribution Analysis
- Surface Tolerance: ±0.5mm
- QC Points: 12 major checkpoints
PERFORMANCE VERIFICATION Manufacturing KPIs:
- Component Precision: 99.8%
- Production Efficiency: 104%
- Material Optimization: 15% reduction
- Technical Compliance: 100%
MATERIAL & FINISH SPECIFICATIONS

EXECUTED INSTALLATION





Project feature
FUNCTIONAL ZONES
- Custom island with seating
- Appliance wall configuration
- Prep area optimization
- Storage maximization
Project feature
LIGHTING DESIGN
- Pendant array installation
- Task lighting integration
- Natural light flow
- Ambient lighting system
