ARCHITECTURAL CASE STUDY

Contemporary Farmhouse Integration

TECHNICAL PROJECT
Manufacturing & Installation Parameters

PROJECT METRICS

  • Integration Area: 485 sq ft
  • Manufacturing Timeline: 7 weeks
  • Installation Period: 3 weeks
  • Load Requirements: 95kg/linear meter

TECHNICAL EXECUTION
Manufacturing Protocol:

  • Cabinet Core: E1 Grade MDF
  • Surface Treatment: UV-cured cashmere finish
  • Hardware Integration: Pull-out systems
  • Edge Processing: Zero-joint technology

Installation Systems:

  • Bifold Door Mechanism: 150kg capacity
  • Sink Mount: Undermount reinforcement
  • Appliance Integration: Multi-point connection
  • Storage Systems: Full-extension slides

PERFORMANCE VERIFICATION Manufacturing Precision:

  • Component Tolerance: ±0.3mm
  • Surface Uniformity: 99.8%
  • Assembly Accuracy: 100%
  • Hardware Calibration: All parameters met

Installation Metrics:

  • Timeline Efficiency: 104%
  • Technical Compliance: 100%
  • Load Testing: All specifications met
  • Post-installation Adjustments: Zero required

MATERIAL & FINISH SPECIFICATIONS

EXECUTED INSTALLATION

TECHNICAL MATERIAL SPECIFICATIONS

MATERIAL INTEGRATION

Material Parameters:

  • Surface Finish: UV-cured cashmere, 9H hardness
  • Hardware Grade: 316 stainless steel
  • Flooring System: Engineered oak, AC5 rating
  • Bifold System: Dark oxide finish, 150kg capacity

System Integration:

  • Appliance Housing: Multi-point mounting
  • Sink Mount: Undermount with support frame
  • Storage Load: 65kg per drawer system
  • Thermal Expansion: ±1.8mm/linear meter