ARCHITECTURAL CASE STUDY

Technical Specification: Contemporary Kitchen Integration

TECHNICAL PROJECT SPECIFICATIONS

Project Scope: Full-Scale Millwork Integration

Manufacturing Timeline: 6 weeks

Installation Period: 2 weeks

Total Project Area: 450 sq ft

TECHNICAL EXECUTION

Manufacturing Specifications:

  • CNC-Fabricated Cabinet Components
  • Integrated Handle Systems
  • Precision Edge-Banding
  • Custom Panel Dimensioning

Material Documentation:

  • Cabinet Core: Premium Grade MDF
  • Finishing: UV-Cured Lacquer System
  • Surface Integration: Corian Fabrication
  • Hardware: Blum Dynamic Systems

Installation Protocol:

  • Sequential Assembly Procedure
  • Inter-trade Coordination Points
  • Quality Control Checkpoints
  • Technical Compliance Verification

PROJECT METRICS

  • Tolerance Adherence: ±1mm
  • Surface Flatness: 0.5mm/1000mm
  • Installation Precision: 98.5%
  • Timeline Efficiency: 100%

MATERIAL & FINISH SPECIFICATIONS

EXECUTED INSTALLATION

Project feature

INTEGRATED WORKSPACE DESIGN

Strategic placement of core functions within the island maximizes workflow efficiency while maintaining open sight lines. The engineered layout incorporates both food preparation and social interaction zones, featuring integrated sink and cooking stations.

PROJECT OUTCOMES & METRICS

Technical Implementation:

  • Manufacturing Precision Rate: 99.8%
  • Installation Timeline Adherence: 100%
  • Quality Control Clearance: All checkpoints passed
  • Zero post-installation adjustments required

Project Management KPIs:

  • Inter-trade Coordination Success Rate: 100%
  • Documentation Compliance: Full technical specifications met
  • Timeline Efficiency: Completed 2 days ahead of schedule
  • Technical Issue Resolution: <24hr response time

Schedule Technical Consultation