TECHNICAL PROJECT
Engineering & Manufacturing Parameters
PROJECT METRICS
- Integration Area: 575 sq ft
- Manufacturing Timeline: 9 weeks
- Installation Period: 4 weeks
- Material Systems: Multi-substrate integration
MANUFACTURING SPECIFICATIONS
Component Production:
- Veneer Processing: Horizontal grain matching
- Stone Fabrication: 30mm engineered quartz
- Metal Integration: 316 grade stainless steel
- Glass Treatment: Tempered skylight system
TECHNICAL INTEGRATION Installation Protocol:
- Load-bearing Analysis: Brick wall integration
- Natural Light Optimization: 85% efficiency
- Surface Tolerances: ±0.4mm
- Structural Support: Reinforced mounting system
MECHANICAL SYSTEMS
- Ventilation Capacity: 1200m³/h
- Power Distribution: 3-phase system
- Temperature Control: Multi-zone
- Load Capacity: 160kg/linear meter
PERFORMANCE VERIFICATION
- Manufacturing Precision: 99.7%
- Installation Accuracy: 100%
- System Integration: All parameters met
- Post-installation Adjustments: Zero required
MATERIAL & FINISH SPECIFICATIONS

EXECUTED INSTALLATION



Project feature
MATERIAL EXECUTION
- Horizontal grain wood veneer implementation
- Quartz with marble veining
- Industrial-grade stainless steel
- Mixed material transitions


TECHNICAL LIGHTING SPECIFICATIONS
Illumination Parameters:
- Natural Light Integration: 92% efficiency
- LED Color Temperature: 3000K
- Lumen Output: 850lm/fixture
- Power Consumption: 12W/unit
System Performance:
- Skylight UV Rating: 99% protection
- Task Light Distribution: 120° beam
- Dimming Range: 0-100%
- Energy Efficiency: Grade A+
VERIFICATION METRICS
- Installation Precision: 100%
- Light Distribution: ±5% variation
- System Integration: All parameters met
- Performance Testing: Exceeds standards